Apply for a waterway decision
According to the Water Traffic Act (782/2019), the construction, placement, modification, or removal of maritime aids to navigation requires a permit granted by the Finnish Transport and Communications Agency, which is issued in the form of a waterway decision.
The scope of the waterway decision varies according to the project: at its largest, the decision may concern the commissioning of a new waterway or the improvement of the entire waterway; at its smallest, a change to an individual waterway or aid to navigation. The application process is the same in all cases, but the amount of information and attachments to be presented depends on the extent of the change. Small-scale measures can also be implemented without a separate, pre-approved waterway plan.
The application ensures that the waterway and aids to navigation are:
- appropriate
- do not endanger maritime traffic safety, and
- the information is sufficient for the waterway register and nautical charts
The processing times for fairway decisions have varied between approximately 5 and 30 days, depending on the scope of the project. The processing times have increased as a result of measures implemented under the Government’s productivity programme. It is important to identify and anticipate the impacts on the implementation of fairway projects.